SafetySetu Permit

Permit to work, without the paper chase.

A complete control of work for hazardous jobs: raise, check, approve, isolate, activate and close every permit on one record, with the whole plant visible at once.

DashboardDahej Unit 1
Live
Active right now12
Awaiting approval3
Open lockouts4
Closed this week38
Permit / workNext actionValidityStatus
DU1/2026/10/HW/000456Hot Work · Maintenance · Reactor Bay R-3Work in progressin 3hActive
DU1/2026/10/CS/000455Confined Space · Production · Vessel V-204Your approval neededin 10hUnder Review
DU1/2026/10/LB/000453Line Breaking · Maintenance · Pipe Rack PR-6Ready to activateNot startedApproved
DU1/2026/10/EL/000425Electrical · Utilities · Substation 1Work in progressin 11hActive
DU1/2026/10/WH/000413Work at Height · Projects · Pipe BridgeWork in progressin 12hActive
Gloved hands fitting a lockout padlock and a danger tag to a valve handle
Isolation · LOTOEvery lockout point is applied, then verified by someone else, before the permit can start.
Control of work

Work starts only when every barrier is in place.

Permit, isolation and approvals run as one control of work, so a hazardous job cannot begin until its safety barriers are verified and authorised.

  1. 01Barriers before workA permit cannot go live until its approvals are complete and every isolation point is verified.
  2. 02One standard, every siteThe same permit types and approval routes across sites and business units, with each site's own setup.
  3. 03Real-time oversightActive permits, open lockouts and expiring work on one live dashboard, for every site.

Coming nextConflict detection for simultaneous operations (SIMOPS).What's next

01 Templates

Your permit forms, built your way.

Hot work, confined space, work at height, electrical: build each one from fields, checklists and signatures.

  • Each section is filled by its owner: requester, safety officer or a named step
  • Smart fields fill themselves from the plant, or pick from your registers
  • Publish a new version without touching permits already open
FieldsTextChecklistGas test readingPerson pickerSignaturePhoto
Job detailsFilled by Requester
Work descriptionEquipmentCrew size
Gas testFilled by Safety officer
LEL %O₂ %
IsolationFilled by Maintenance
Lockout points
Draft · version 4Publish
02 Approval workflows

Routes that find the right person.

Sequential or parallel steps, routed by role, department or seniority, or to a person picked when the permit is raised.

  • Resolved to real people the moment the permit is submitted
  • Approvers are told in the app, by email and by SMS
  • Approve from a desk or from the mobile app
RequesterSubmittedArjun Rao
By departmentArea ownerS. Iyer
By roleSafety officerR. Patel
In parallelFire officerN. Mehta
By seniorityDepartment headV. Desai
Approved · ready to activate
03 Isolation · LOTO

No permit starts on a live line.

Lockout points come from the equipment register. Each is applied, then verified by someone else.

  • Activate stays locked until every point is verified
  • Equipment carries a QR label, so the right point is scanned in the field
  • Isolated equipment cannot be picked for a second lockout
Lockout for Reactor Bay R-3DU1/2026/10/HW/000456
  • Main breaker MCC-4Not appliedOpen
  • Steam valve V-112Not appliedOpen
  • Feed line V-118Not appliedOpen
0 of 3 verifiedActivate permit
04 Kiosk sign-on

The crew signs on at the kiosk.

A kiosk at the permit office or the work area. Each worker signs in with their face or a PIN, sees the permits they are named on, confirms the precautions and signs on.

  • Face sign-in with a live-person check, or employee ID and PIN
  • Sign-on opens only once the permit is active
  • Every sign-on is recorded against the permit, with the time and the person
Permit kioskPermit office · Dahej Unit 109:12
Camera
Sign in · FaceLook at the camera
  • Face found
  • Live person
  • Matched to worker record
Use PIN instead
Kiosk mode
05 Validity

Time runs on the plant clock.

Validity starts on activation, in the site's own time zone. Extensions are 8, 12 or 24 hours, and go to the role you set for each permit type.

  • No one approves their own extension
  • One open extension request per permit
  • Expiring permits surface on the dashboard before they lapse
Plant clock · ISTEnds 18:00
09:0018:0002:00
Extension requestKiran Menon
The requester cannot approve their own request
Waiting for Shift in-chargeApprover role set on the Hot Work permit type
06 Audit trail

Every action, on the record.

Each action is time-stamped with who did it, and written in the same step as the change itself, so the record never falls behind the work.

  • Archived permits, lockouts and their PDFs found in seconds, for an audit or an investigation
  • The permit as a PDF, laid out like the paper form
  • The full history of any period exported to Excel
  1. 08:12Raised the permitKiran Menon
  2. 08:31Approved as Area ownerSanjay Iyer
  3. 08:44Recorded gas test · 0% LELRakesh Patel
  4. 08:52Approved as Department headVikram Desai
  5. 08:55Applied 3 isolation pointsRajesh Kumar
  6. 08:58Verified 3 isolation pointsDeepak Rane
6 entries · written with each changePermit PDF
07 Reports

See where the delays and the risk are.

A library of standard reports and a builder for your own, run over any period and sliced by site, department, permit type or contractor.

  • Approval turnaround, late closures, extension pressure and work under an expired permit
  • Isolation time by equipment, and lockouts with no linked permit
  • Any report exported to Excel, for internal reviews and board packs
  • Standard reports
  • Permit throughput
  • Approval turnaround
  • Late closure
  • Extension pressure
  • Isolation time by equipment
  • Isolations with no linked permit
Approval turnaroundThis quarterBy department
Median hours to approve
  • Maintenance2.4h
  • Production1.6h
  • Utilities3.1h
  • Projects4.2h
Any period · any siteExport to Excel
Mobile app

Approve from where you are standing.

Raise permits, approve, log work and track isolation from the phone. Every decision lands on the same record the control room is watching.

  • Notifications on every permit you are part of
  • The executing crew fills its own section as the work runs
Approval neededDU1/2026/10/CS/000455
Confined SpaceVessel V-204Raised by Arjun Rao
  1. Area ownerS. Iyer
  2. Safety officerYou
  3. Department headV. Desai
Also in your queue
ElectricalSubstation 1
Work at HeightPipe Bridge
RejectApprove

Bring your hardest permit. We will run it.

Book a demoor write to hello@safetysetu.com